  • EquipmentABB fusible disconnect, fire pump controller, PVC duct bank

A distribution building is really three buildings stacked into one permit. There is the warehouse itself, the office block bolted onto the front, and the fire protection system that has to work whether or not anything else does.

Our scope covered all three. Outside, a crew built an underground conduit bank against the wall and swept it up into the building, working an open trench beside formed footings with the stub ups already standing. Inside, feeders came off reels, ran up to a wall mounted pull box and landed on the bus in the gear. The fire pump room got its own attention, because that is the room an inspector will spend the most time in. Then came the office side, ceiling grid and all. Work at this scale sits squarely inside commercial electrical construction, while the pump and process side leans on our industrial electrical experience.

What does a fire pump need from the electrical side?

A dedicated, protected supply that survives whatever takes the rest of the building down. The fire pump is the one load in a warehouse expected to keep running while the building burns.

In the gallery you can see the room. A WEG motor is coupled to a horizontal split case pump on a red skid, with 6 inch Wheatland Sch 10 riser piping grooved and coupled overhead. The red cabinet on the wall is the fire pump controller, and it is fed by rigid galvanized conduit rather than anything flexible, because the raceway itself is part of the survivability. Around it, every valve gets a tamper switch and every riser gets a flow switch, each one running back through its own short length of flexible conduit to a monitoring point.

None of that is optional and none of it passes on a technicality, because the authority having jurisdiction tests it. That is why the fire pump room usually drives the schedule on a warehouse, and why a licensed electrical contractor in Orange County will want it roughed and signed off well ahead of the final electrical inspection.

Sprinkler risers with tamper and flow switches wired in flexible conduit at the EMS warehouse

When does the underground have to be finished?

Before the concrete. Once a slab or a paved apron is down, the cost of adding a conduit run multiplies, so the duct bank goes in while there is still open dirt to work in.

The photo of three of our electricians kneeling in a trench beside the building is the whole point. They are gluing sweeps and stubbing risers up the wall while the footing forms are still standing next to them. Long radius sweeps go first, spaced and racked so the pull will not bind later, then the trench gets backfilled in lifts and compacted so nothing settles under the pavement two years from now. A second photo shows a tech splicing out near the existing utility cabinets on the far side of the property, which is the other half of underground work: getting from the incoming service to the building without disturbing anything already live.

Underground is unglamorous and it is where a build gets ahead or falls behind. Everything after it, including the lighting installation inside, waits on it.

Electrician working in an open trench beside the utility cabinets outside the EMS warehouse

What changes when a warehouse also has offices in it?

The standard changes room by room. Sixty feet of open warehouse and a twelve foot office corridor are different electrical environments even though they share a service.

In the warehouse the fixtures are linear strips on chain, hung from the roof structure alongside the sprinkler main and the galvanized conduit, spaced for aisles rather than desks. Our crews worked those off a Skyjack and a JLG scissor lift. Step through the door into the office block and it becomes suspended ceiling grid, exit signage, boxes and whips dropped into that grid, a Daikin mini split controller on the wall and EMT stubbed up out of the block. Same building, same service, a completely different install.

The gear ties it together. A three phase ABB fusible disconnect with black, red and blue conductors and a bonded ground bar. A switchboard section with copper bus and feeder lugs waiting on terminations. If any of that ever fails at two in the morning, our emergency electricians are the ones who come out.

Electrician on a ladder installing boxes above the ceiling grid in the EMS warehouse office area
From the job site

EMS warehouse project photos

Three Spectrum Electric electricians assembling an underground PVC conduit bank beside the EMS warehouse
Fire pump room piping and galvanized conduit feeding the fire pump controller at the EMS warehouse
WEG fire pump motor and horizontal split case fire pump piped and wired at the EMS warehouse
Sprinkler risers with tamper and flow switches wired in flexible conduit at the EMS warehouse
Two electricians running conduit from a panelboard up a block column inside the EMS warehouse
ABB fusible service disconnect with three phase feeders and a bonded ground bar at the EMS warehouse
Copper bus bars and feeder terminations inside the EMS warehouse switchboard
Large feeder conductors dropping from a wall mounted pull box to a scissor lift inside the EMS warehouse
Conduit risers, wire reels and a JLG lift staged in the EMS warehouse before the feeder pull
Electrician working in an open trench beside the utility cabinets outside the EMS warehouse
Office corridor at the EMS warehouse with suspended ceiling grid, exit sign and conduit stub ups
Electrician on a ladder installing boxes above the ceiling grid in the EMS warehouse office area
Electricians on a Skyjack lift installing a high bay fixture under the EMS warehouse roof deck
Chain hung linear LED strip fixtures and galvanized conduit under the EMS warehouse roof

Planning a warehouse build or a fire pump replacement?

We handle the service, the underground, the pump room and the lighting as one scope. Call (407) 880-8977 to walk the site with us.

To Top